A gray winter's day

Members can post FOTR related pictures of the new Hermanstad Site here - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will be pruned after 90 days. If you want to keep them for later, save them to your hard drive!
Post Reply
User avatar
Steve Appleton
Site Admin
Posts: 3606
Joined: 23 Jan 2007, 14:14
Location: Johannesburg, South Africa

A gray winter's day

Post by Steve Appleton »

A classic British railway shot? It should be - the weather's right, but the track gauge isn't.
Backing the train out from the FOTR Hermanstad depot into a cold, miserable Hercules station early one winter's morning, August 1st, 2009. Picture: Steve G Appleton, 20090801.
Backing into Hercules_20090801.jpg
"To train or not to train, that is the question"
User avatar
Dylan Knott
Posts: 872
Joined: 17 Aug 2007, 19:44
Location: Cape Town

Re: A gray winter's day

Post by Dylan Knott »

How are you allowed to push back in a CTC section? Certainly, not allowed down here.
User avatar
Steve Appleton
Site Admin
Posts: 3606
Joined: 23 Jan 2007, 14:14
Location: Johannesburg, South Africa

Re: A gray winter's day

Post by Steve Appleton »

Yes, but like all movements, only if authorised by CTC. In a section, that would only be authorised under exceptional circumstances - a driver cannot take it upon himself to "set back". Nonetheless there are rules, contained in the manuals, that if authorised by CTC there must be at least two clear blocks protected by signals at danger (from memory -- books are at home) in the rear before it can be allowed.
In the case of FOTR's setting-back out of the Hercules yard, although the train is being propelled, we are essentially carrying out a normal train movement authorised by CTC (in conjuntion with the yard control point shunter) in the form of a single or double yellow signal operated at the yard exit. We are not setting back in a section. As you can see, the signal in the rear is set to green for us to pass it. We push back until the loco has passed the position-light shunt signal you see down between the tracks, before pulling off loco-first towards Cullinan, which is authorised by the operation of that shunt signal when the points have been operated and the track towards Capital Park is clear. To be able to pass that shunt signal on push-back usually means that the rear of the train has to pass that green signal at the left. I will shortly post a few more pics here showing the sequence that day.
We use that same shunt signal (HER 2460) and one more further back after the cross-over to push-back into the yard on returning.
"To train or not to train, that is the question"
User avatar
Steve Appleton
Site Admin
Posts: 3606
Joined: 23 Jan 2007, 14:14
Location: Johannesburg, South Africa

Re: A gray winter's day

Post by Steve Appleton »

The sequence out of Hercules (FOTR's Hermanstad station) as promised - pictures: a shivering, damp Steve G Appleton, August 1, 2009.
Waiting for the Metros. Yard exit signal at danger.
Waiting for the Metros. Yard exit signal at danger.
Yet another Metro - serves us right for trying to get out at peak hour!
Yet another Metro - serves us right for trying to get out at peak hour!
Yeah! Radio: "Driver, signal operated single yellow. Clear behind. You may push back!"
Yeah! Radio: "Driver, signal operated single yellow. Clear behind. You may push back!"
"Driver, next signal is at danger. About 10 coach lengths to a signal at danger!"
"Driver, next signal is at danger. About 10 coach lengths to a signal at danger!"
"Driver, next signal has been operated - signal is at green, proceed. Clear all the way back."
"Driver, next signal has been operated - signal is at green, proceed. Clear all the way back."
"To train or not to train, that is the question"
Post Reply

Return to “FOTR - The New Hermanstad Site”