A series of photos by Nathan Berelowitz, August 2010Nathan wrote:Trackwork at Hermanstad in August. See how hard it is to loosen rail screws and these same screws had to be loosened at Cullinan when the theft occurred leading to the 15F derailing
Hermanstad improvements August 2010 - 6
- John Ashworth
- Site Admin
- Posts: 23606
- Joined: 24 Jan 2007, 14:38
- Location: Nairobi, Kenya
- Contact:
Hermanstad improvements August 2010 - 6
- Attachments
-
- trains 2010 001.jpg (36.86 KiB) Viewed 1376 times
-
- trains 2010 002.jpg (57.3 KiB) Viewed 1376 times
-
- trains 2010 003.jpg (60.15 KiB) Viewed 1376 times
-
- trains 2010 004.jpg (59.47 KiB) Viewed 1376 times
-
- trains 2010 005.jpg (71.58 KiB) Viewed 1376 times
-
- trains 2010 006.jpg (72.94 KiB) Viewed 1376 times
-
- trains 2010 007.jpg (36.61 KiB) Viewed 1376 times
-
- trains 2010 008.jpg (40.97 KiB) Viewed 1376 times
-
- trains 2010 009.jpg (67.3 KiB) Viewed 1376 times
-
- trains 2010 010.jpg (72.19 KiB) Viewed 1376 times