Hermanstad Update 5th March 2011
Photos and captions by Nathan Berelowitz, 5th March 2011
- Attachments
-
- James Smith arranged for the start of sorting the rails out on our storage section. He has arranged three concrete main line sleepers to be the base for the heavy track. Then the truck burst its hydraulic pipes and that was all that was achieved in a morning!!
- hermanstad site update 5march 2011 005.jpg (95.59 KiB) Viewed 1145 times
-
- The storage yard looking Eastwards to the main gate. Watch this space!
- hermanstad site update 5march 2011 006.jpg (79.57 KiB) Viewed 1145 times
-
- Steve Smith assisted by Tom, Raymond and Welcome, as he constructs the shed roof to protect the diesel generator. Now we know why the hoarding of material is so important!
- hermanstad site update 5march 2011 002.jpg (71.16 KiB) Viewed 1145 times
-
- hermanstad site update 5march 2011 003.jpg (59.65 KiB) Viewed 1145 times
-
- Tom about to assist Steve Smith as he finishes off a roof sheet for the newly constructed covering for the generator. Note the roof is on and soon painting will commence.
- hermanstad site update 5march 2011 007.jpg (47.03 KiB) Viewed 1145 times