TAZARA procures a 200-ton Well-Wagon at a cost of US$ 1 million, for transporting Out of Gauge or abnormal loads such as turbines and other components for the Julius Nyerere Hydro Power Plant from Dar es Salaam to Fuga Station...

Post by John Ashworth »
TAZARA procures a 200-ton Well-Wagon at a cost of US$ 1 million, for transporting Out of Gauge or abnormal loads such as turbines and other components for the Julius Nyerere Hydro Power Plant from Dar es Salaam to Fuga Station...