Indian Railways starts double-stack electric operation
Posted: 12 Jun 2020, 07:44
Indian Railways starts double-stack electric operation
Regular operation of electrically-hauled double-stack container trains on the Indian Railways network began on June 10, with the start of electric haulage on the 270 km Palanpur – Botad section of the Western Railway...