25. August 2008 - More preparation for the second level.
Posted: 20 Oct 2008, 08:30
Work continues preparing for the second level.
In essence the one side of the layout has merely a second level - the other side is a bit more mountainous and contains a hidden loop.
Photo one shows the second level track in place, plus the risers now in for the scenery. Photo2 shows a view of the same area from a different angle.
Photo 3 shows the loop area cut out, with one of the circular track risers for the loop in the foreground.
Construction of the circular riser is relatively simple - photo 4 shows you how this done.
In essence the one side of the layout has merely a second level - the other side is a bit more mountainous and contains a hidden loop.
Photo one shows the second level track in place, plus the risers now in for the scenery. Photo2 shows a view of the same area from a different angle.
Photo 3 shows the loop area cut out, with one of the circular track risers for the loop in the foreground.
Construction of the circular riser is relatively simple - photo 4 shows you how this done.