40. December 2008 - The upper extension goes further...
Posted: 30 Dec 2008, 12:53
In Part 32 the upper extension to the spiral was done. This is now continued around the back to the right hand side. A clcokwise tour of progress......
Photo 1 shows the left upper spiral as a reference starting point.
Photo 2 - Elevated area for some sidings.
Photo 3 - Corner showing the access galleries.
Photo 4 - Peering down - 3 levels.
Photo 5 - Out of the corner and along past the bridge.
Photo 6 - View down the back, showing to the left the next area to be worked on to bring it up to the level of the finished elevations........
Photo 1 shows the left upper spiral as a reference starting point.
Photo 2 - Elevated area for some sidings.
Photo 3 - Corner showing the access galleries.
Photo 4 - Peering down - 3 levels.
Photo 5 - Out of the corner and along past the bridge.
Photo 6 - View down the back, showing to the left the next area to be worked on to bring it up to the level of the finished elevations........