
Swedish Green Cargo Rc 4 Bo-Bo 1267 at Narvik Port Intermodal Terminal.
Built 1975 16 2/3 kV 3600kW

Swedish Green Cargo Rc 4 Bo-Bo 1271 at Narvik Port Intermodal Terminal.
Built 1975 16 2/3 kV 3600kW

Norwegian Cargo Net 226B 4-Wheel Light Shunter Diesel Hydraulic (Number Obscured) at Narvik Port Intermodal Terminal.
Built 1971 265kW
The rail set up in Narvik is unusual as the access to the rest of the Norwegian system involves several hundred km detour through Sweden.
Passenger services are more an extension of the Swedish system that the Norwegian System
The line was built to transport iron ore from Sweden to an ice free port in Norway.