Boiler care in Iowa

Photos of motive and rolling stock, stations, signals and anything else train related in North, Central and South America! Photos should be 800x600 pixels, maximum size 130K. Very good ones will be moved to the Online Gallery, the rest will be pruned away after 14 days to conserve space.
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Boiler care in Iowa

Post by John Ashworth »

Peter Odell wrote:A number of people have asked for feedback on boiler handling noted on the Iowa Interstate QJ,s So I thought I may as well share with the S A preservation community. Excuse delay.

Steam services of America, handling the QJ,s, put emphasis on boiler care by keeping a constant boiler temperature & pressure as far as possible, rather wasting feedwater than breaking stays. Not so easy to do in S African conditions where most operators have to be carefull not to waste water and the poor coal we get would soon clinker if fired a few shovells at a time every few mins while standing.

Light up - See pics 011 & 012 Industrial hot air blowers are placed at the firebox door for 12+ hours before light up. The boiler is thus slightly warmed when fire lit. Steam raising was monitored by taking temperature readings with the laser off washout plugs.[Note all washout plugs nicely numbered]

Steaming - use of the feedwater pump makes maintaining a constant pressure much easier than the "cold water" injectors we are used to.

Standing- The practise was to add 4-5 shovells every few minutes and to constantly put the injectors on rarely for longer than 30 seconds,keeping sufficient water and a constant boiler pressure. The small size, excellent non clinkering coal made this possible. Completely different from the S A practise of banking the fire,filling boiler & pressure dropping up to 30lbs.

Feedwater treatment- Water consumption was monitored using the "dipstick" marked off in 1,000 gallon increments. Anti priming and corrosion treatment was added using a predetermined formula/ratio at each top up.

Disposal - 1]Stable locomotive 2] Fill boiler 3] LEAVE fire 4]Cap chimney 5] Rake out dead fire/ash 2-3 days later. 6]Drain water from boiler and dry out using, I think, compressed air.

[Certainly no horror stories like I recently witnessed of throw out fire/fill boiler/move loco/wash firebars with spraypipe!]
regards Peter J Odell Kimberley


016.jpg Water treatment mixtures & dipstick
003.jpg Hand held laser temperature gauge
007.jpg taking temperature reading off washout plug
011.jpg Hot air blowers
012.jpg Hot air blowers
Attachments
016.jpg
016.jpg (115.98 KiB) Viewed 1148 times
003.jpg
003.jpg (40.06 KiB) Viewed 1148 times
007.jpg
007.jpg (56.39 KiB) Viewed 1148 times
011.jpg
011.jpg (167.45 KiB) Viewed 1148 times
012.jpg
012.jpg (160.66 KiB) Viewed 1148 times
Image
Post Reply

Return to “North/Central/South America - Photo Gallery”