Photos by James Smith 16/02/09James Smith wrote:Update on FOTR Site 16 February 2009-02-18
1. The points outside the TFR Infrastructure depot have been lifted.
2. The points have been stored in the infrastructure area until they can be moved to the FOTR yard.
3. The first of the panels moved to the TFR yard have been laid and connected to the network
Tracklaying at Hercules 2
- John Ashworth
- Site Admin
- Posts: 23606
- Joined: 24 Jan 2007, 14:38
- Location: Nairobi, Kenya
- Contact:
Tracklaying at Hercules 2
- Attachments
-
- clip_image002.jpg (47.66 KiB) Viewed 1342 times
-
- clip_image004.jpg (52.27 KiB) Viewed 1343 times
-
- clip_image006.jpg (56.15 KiB) Viewed 1343 times
-
- clip_image008.jpg (56.31 KiB) Viewed 1343 times
-
- clip_image010.jpg (57.63 KiB) Viewed 1340 times
-
- clip_image012.jpg (52.39 KiB) Viewed 1340 times
-
- clip_image014.jpg (55.37 KiB) Viewed 1341 times
-
- clip_image016.jpg (48.9 KiB) Viewed 1340 times
-
- clip_image018.jpg (54.68 KiB) Viewed 1372 times
-
- clip_image022.jpg (54.26 KiB) Viewed 1335 times