First 208-wagon manganese train

For Southern African Railway News and Discussion. Any photos should be posted in the "South Africa - Photo Gallery" Forum below.
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

First 208-wagon manganese train

Post by John Ashworth »

FIRST 208-WAGON MANGANESE TRAIN

On September 18, 2012 Railways Africa

On 13 September, a 208-wagon manganese test train left the Tshipi Borwa mine in the Northern Cape, bound for Port Elizabeth. It included four test coaches and 208 loaded CR wagons. Nett cargo mass was 13,104 tons. Total train length overall was 2.23km, with a gross mass of 16,640 tons.

The 18 diesel locomotives – grouped at the head, middle and rear of the consist – were controlled from the leading unit using radio distributed power (RDP) technology, previously employed exclusively on the heavy-haul Sishen-Saldanha iron ore line.

The standard train length for manganese traffic to the Eastern Cape comprises 104 wagons.

This was also the first train to use Tshipi’s newly commissioned siding. The facility features a long loop accommodating three 122-wagon trains to be parked without blocking the main line.
Image
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Re: First 208-wagon manganese train

Post by John Ashworth »

More on this train - see atatchments
You do not have the required permissions to view the files attached to this post.
Image
Post Reply

Return to “South Africa - General Railway News and Discussion (except for Heritage News)”