2650 and the Gautrain

Post pictures of FOTR trips and events - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will eventually be pruned, so make sure you have copies on your hard drive if you want to keep them.
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

2650 and the Gautrain

Post by John Ashworth »

Photos and captions by Nathan Berelowitz 30th November 2008
Attachments
Steam-hauled Tshwane Xplorer rolls past the new Gautrain bridge supports at the entrance to Pretoria. At this point, there are three bridges, one being the old NZASM, of which only a cut off portion exists, the current railway bridge and the soon to be Gautrain one
Steam-hauled Tshwane Xplorer rolls past the new Gautrain bridge supports at the entrance to Pretoria. At this point, there are three bridges, one being the old NZASM, of which only a cut off portion exists, the current railway bridge and the soon to be Gautrain one
trainfotr_weekend_28+29nov2008_030.jpg (51.12 KiB) Viewed 1032 times
Completed bridge works at Loftus Verseveld station, ready for Gautrain tracks. The Tshwane Xplorer, and 19D 2650, go rolling by
Completed bridge works at Loftus Verseveld station, ready for Gautrain tracks. The Tshwane Xplorer, and 19D 2650, go rolling by
trainfotr_weekend_28+29nov2008_038.jpg (58.37 KiB) Viewed 1035 times
Long standing palm trees are now horizontal and ready for replanting, as they have to make way for the Gautrain development. This is University road near to Loftus Verseveld station. Train is en route Rissik
Long standing palm trees are now horizontal and ready for replanting, as they have to make way for the Gautrain development. This is University road near to Loftus Verseveld station. Train is en route Rissik
trainfotr_weekend_28+29nov2008_039.jpg (51.02 KiB) Viewed 1032 times
19D 2650 approaches Rissik and here one can see the development of the Gautrain formation
19D 2650 approaches Rissik and here one can see the development of the Gautrain formation
trainfotr_weekend_28+29nov2008_040.jpg (68.83 KiB) Viewed 1031 times
The new alignment for Transnet Freight Rail/Metro lines goes into this underpass built as part of the Gautrain developmenbt. This will be the terminal point for the new train as it reaches Hatfield, near Rissik station. The 19D makes club history as the first steamer to pass this way.
The new alignment for Transnet Freight Rail/Metro lines goes into this underpass built as part of the Gautrain developmenbt. This will be the terminal point for the new train as it reaches Hatfield, near Rissik station. The 19D makes club history as the first steamer to pass this way.
trainfotr_weekend_28+29nov2008_046.jpg (67.79 KiB) Viewed 1033 times
Image
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Re: 2650 and the Gautrain

Post by John Ashworth »

Nathan wrote:The new tunnel at Rissik where the end point for the Hatfield leg of the
Gautrain will be situated. The works for that will be on the right of the
picture. First time FOTR has had a train on this section, as the route was
also closed over weekends for construction purposes
Attachments
Photo by Nathan Berelowitz November 2008
Photo by Nathan Berelowitz November 2008
trainfotr_weekend_28+29nov2008_047.jpg (59.43 KiB) Viewed 1021 times
Image
Post Reply

Return to “FOTR Trips and Events”